作 者:朱强[1] ZHU Qiang(Changjiang Institute of Technology,Wuhan 430212,China)
出 处:《水电与新能源》2023年第7期51-53,57,共4页Hydropower and New Energy
基 金:湖北省中华职教社2022年度课题(HBZJ2022290),适应性专长视野下湖北地区高职学生职业行动能力发展研究,2022-05至2023-10。
摘 要:针对富水水库存在的坝坡塌陷、渗漏严重等安全隐患,采用干砌石、预制板稳固、垂直混凝土防渗墙等方法对坝坡进行除险加固。依据简化毕肖普理论通过AutoBANK有限元模拟方法,分别对坝体及心墙在校核洪水位、设计洪水位、正常蓄水位等不同运行工况下的稳定性分析表明,各运行工况下的坝坡稳定性均满足规范要求,可作为大坝的加固设计、施工和后期运行管理的依据,并建议在大坝的运行中加强监测。Safety risks such as dam slope collapse and severe seepage are observed in Fushui Reservoir.Thus,technical measures such as dry masonry,precast slab stabilization,and vertical concrete cutoff wall are used to reinforce the dam slope.Based on the simplified Bishop theory,AutoBank finite element simulation software is adopted to analyze the stability of the dam body and the core wall under different working conditions such as the check flood water level,design flood water level,and normal storage water level.The results show that the stability of the dam slope under various working conditions meets the specification requirements,which can provide useful basis for the reinforcement design,construction and later operation management of the dam.Also,it is suggested to strengthen the monitoring work during the operation of the dam.
分 类 号:TV698[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40