作 者:李昌秋 Li Changqiu(Zhengzhou Coal Group(Henan)Baiping Coal Industry Co.,Ltd.,Henan Zhengzhou 450000)
机构地区:[1]郑煤集团(河南)白坪煤业有限公司,河南郑州450000
出 处:《山东煤炭科技》2023年第6期23-25,共3页Shandong Coal Science and Technology
摘 要:为实现大断面岩巷快速掘进,分析目前阶段巷道单进水平低的影响因素,采取优化EBZ318型综掘机掘进工艺,变更巷帮钻场施工规格与设计,调节顶帮锚网索支护方式及参数,优化超前探和区域措施孔的设计布置等综合措施。方案优化后,巷道单月进尺由150 m提升到240 m,综合成本可节约282.6万元,施工周期缩短两个月。In order to achieve rapid excavation of the large cross section rock roadway,the influencing factors of low single entry level in the current stage of roadways are analyzed.Comprehensive measures such as optimizing the excavation process of the EBZ318 type comprehensive excavation machine,changing the construction specifications and design of the roadway side drilling site,adjusting the top side anchor mesh cable support method and parameters,optimizing the design and layout of advance exploration and regional measure holes are taken.After the optimization of the scheme,the monthly footage of the roadway is increased from 150 m to 240 m,resulting in a comprehensive cost savings of 2.826 million yuan and a shortened construction period of two months.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.70