检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马雁飞 Ma Yanfei(Jinneng Holding Coal Industry Group Zhaozhuang Coal Industry Co.,Ltd.,Shanxi Changzhi 046600)
机构地区:[1]晋能控股煤业集团赵庄煤业有限责任公司,山西长治046600
出 处:《山东煤炭科技》2023年第6期47-49,共3页Shandong Coal Science and Technology
摘 要:针对大体积高冒区存在的瓦斯积聚和顶板冒落隐患,采用钢丝绳悬吊工字钢方式构建人工假顶对高冒区底部进行封闭,选择无机发泡材料作为充填材料,6min失去流动性,1~2h固化,膨胀倍数5倍,密度0.4 g/cm^(3),3 d强度约2 MPa。效果考察表明,充填体与顶板紧密贴合,高冒区完全充满,充填体成型强度达到设计要求,5个月观测期内顶板下沉量为零。Aiming at the hidden dangers of gas accumulation and roof caving in large volume and top coal caving regions,an artificial false roof is constructed by hanging I-beams with steel wire ropes to seal the bottom of the top coal caving region.Inorganic foam material is selected as the filling material,losing fluidity in 6 minutes,curing in 1-2 hours,expansion factor 5 times,density 0.4 g/cm^(3),and strength of about 2 MPa after 3 days.The effectiveness inspection shows that the filling body is tightly attached to the roof,the top coal caving region is completely filled,and the forming strength of the filling body meets the design requirements.The roof subsidence amount during the 5-month observation period is zero.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28