检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王万里 Wang Wanli(Guotun Coal Mine of Shandong Energy Group Luxi Mining Industry Company,Shandong Linyi 276000)
机构地区:[1]山东能源集团鲁西矿业公司郭屯煤矿,山东临沂276000
出 处:《山东煤炭科技》2023年第6期190-192,共3页Shandong Coal Science and Technology
摘 要:为降低掘巷过断层期间冲击地压诱发风险,以郭屯煤矿3305轨道顺槽过DF55断层构造区为背景,分析了掘巷过断层期间的冲击危险性,采取了ARAMIS M/E微震监测系统区域监测、钻屑法和应力在线监测的局部监测预警技术,提出了大直径钻孔卸压和爆破卸压解危措施,保证了巷道顺利通过DF55断层影响区。In order to reduce the risk of rock burst induced during the period of driving roadway passing through faults,taking the 3305 track groove of Guotun Coal Mine passing through the DF55 fault structural area as the background,the risk of rock burst during the period of driving roadway passing through faults is analyzed.Local monitoring and early warning technologies such as the ARAMIS M/E microseismic monitoring system regional monitoring,drilling debris method,and stress online monitoring are adopted,hazard relief measures of large diameter borehole pressure relief and blasting pressure relief are proposed to ensure the smooth passage of the roadway passing through the DF55 fault affected area.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222