摘  要:重庆至黔江铁路站前2标,位于重庆市渝中区、南岸区境内,线路整体跨越浅丘、河谷、低山地貌,线路长度为19.155km,重难点控制性工程为重庆长江隧道11942m(3845m盾构)。重庆长江隧道为双线特长隧道,按Ⅰ级高风险隧道管理,该隧道是渝黔公司确定的全线12项重难点工程之一。其中,盾构组装洞位于隧道关键线路上,该洞室的施工进度对本标段的工期具有重大影响;隧洞围岩控制常因工程特点不同而出现新问题,特别对于超大断面、长隧洞而言,由于其埋深变化大、穿越地层的地质条件复杂多变,其设计与施工均是一个受多因素影响的复杂过程。对于隧洞施工部位,围岩开挖和变形通常是相互制约、相互影响的耦联关系,如何能够快速、安全地进洞施工,逐步成为隧洞工程建设领域的关键问题。The front section 2 of Chongqing-Qianjiang railway station is located in yuzhong district and nan'an district of chongqing.The whole line crosses shallow hills,river valleys and low mountains.the line length is 19.155 km.The key and difficult control project is 11942 m(3845 m shield)of Chongqing Yangtze river tunnel.Chongqing Yangtze river tunnel is a double-track extra-long tunnel,which is managed according to Class I high-risk tunnel,and is one of the 12 key and difficult projects of the whole line determined by Chongqing and Guizhou Railway Company.Among them,the shield assembly tunnel is located on the key line of the tunnel,and the construction progress of the tunnel chamber has a significant impact on the construction period of this bid section;tunnel surrounding rock control often presents new problems due to different engineering characteristics,especially for super large cross-section and long tunnels,because of the large variation of buried depth and the complex and changeable geological conditions of the crossing strata,its design and construction are a complex process affected by multiple factors.For the construction part of the tunnel,the excavation and deformation of surrounding rock is often a coupling relationship that restricts and affects each other.How to enter the tunnel quickly and safely has gradually become a key issue in the field of tunnel engineering construction.

关 键 词:盾构机组装洞 超大断面 进洞施工 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象