检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Renlong Zhu Xiaoping Zhou Shuchen Luo Lerong Hong Hanhang Yin Yifeng Liu
机构地区:[1]College of Electrical and Information Engineering,Hunan University,Changsha 410082,China [2]State Grid Hunan Electric Power Company Limited Economical and Technical Research Institute,Changsha 410011,China
出 处:《Journal of Modern Power Systems and Clean Energy》2023年第3期1020-1026,共7页现代电力系统与清洁能源学报(英文)
基 金:supported by the National Key Research and Development Program of China(No.2021YFB2400902);the Innovation Young Talents Program of Changsha Science and Technology Bureau(No.kq2107005);the Postgraduate Scientific Research Innovation Project of Hunan Province(No.QL20210101).
摘 要:For the safe and fast recovery of line commutated converter based high-voltage direct current(LCC-HVDC)transmission systems after faults,a DC current order optimization based strategy is proposed.Considering the constraint of electric and control quantities,the DC current order with the maximum active power transfer is calculated by Thevenin equivalent parameters(TEPs)and quasi-state equations of LCC-HVDC transmission systems.Meanwhile,to mitigate the subsequent commutation failures(SCFs)that may come with the fault recovery process,the maximum DC current order that avoids SCFs is calculated through imaginary commutation process.Finally,the minimum value of the two DC current orders is sent to the control system.Simulation results based on PSCAD/EMTDC show that the proposed strategy mitigates SCFs effectively and exhibits good performance in recovery.
关 键 词:Line commutated converter(LCC) high-voltage direct current(HVDC) DC current order calculation subsequent commutation failure(SCF) RECOVERY
分 类 号:TM721.1[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.206.183