作 者:朱其敏 朱俊涛 夏欢[1] 王通 戴俊平 Zhu Qi-min;Zhu Jun-tao;Xia huan;Wang Tong;Dai Jun-ping(CCCC Second Harbour Engineering Co.Lt.,Wuhan 430040,China;Jiangsu Communications Engineering Construction Bureau,Nanjing 210004,China)
机构地区:[1]中交第二航务工程局有限公司,武汉市430040 [2]江苏省交通工程建设局,南京市210004
出 处:《公路》2023年第6期107-114,共8页Highway
摘 要:张靖皋长江大桥南航道桥跨度2 300 m,为世界最大跨径悬索桥,南锚碇采用了支护转结构复合地下连续墙基础,对地下连续墙施工质量提出了更高的要求,且存在超深异型槽段,成槽施工质量控制难度大。以南锚碇地下连续墙基础为依托,开展现场工艺试验,从槽壁稳定性控制、成槽施工工艺以及成槽质量控制3个方面系统研究了超深异型地下连续墙成槽施工关键技术,结果表明:采用水泥土搅拌桩以及加强施工过程中的泥浆管理,可以保证超深异型地下连续墙槽壁稳定性;相比于纯铣工艺,抓铣结合施工工艺有利于泥浆指标控制,可以降低清孔换浆时间,更加节能环保,主体工程施工时可将抓铣结合施工工艺推广至其他形状槽段施工;采用加长型孔口导向架可以防止异型槽段成槽时孔型发生扭转,应用勤测勤纠技术实现了超深地下连续墙高精度成槽,高于工程控制要求(1/800),保证了十字型槽段钢箱的顺利下放;采用更具备科学依据的贯入式沉渣厚度检测仪可以对沉渣厚度进行准确检测,从而控制沉渣厚度,保证地下连续墙承载力。With the main span of 2300 m,the South Channel Bridge of Zhang-Jing-gao Yangtze River Bridge is the largest suspension bridge in the world.The south anchorage adopts the composite diaphragm wall foundation,which imposes higher requirements for the construction quality of diaphragm wall.Moreover,there are super deep special shaped trenches,so it is difficult to control the quality of diaphragm wall.Based on the diaphragm wall foundation of south anchorage,field technological tests are carried out to systematically study the key trenching construction technology for ultra-deep special-shaped diaphragm wall from the aspects of stability control,construction technology and quality control of trench wall.The results show that:the trench stability of the trench wall of the ultra deep special-shaped diaphragm wall can be ensured by using cement soil mixing piles and strengthening the mud management during the construction process.Compared with double-wheel trench cutter,the combination of grab bucket and double-wheel trench cutter is conducive to the control of mud indicators,which can reduce the time for hole cleaning and mud replacement,and is more energy saving and environment friendly.It should be promoted during the construction of the main project.Using the extended guide frame can prevent torsion during the construction of special-shaped diaphragm wall.High-precision grooving of ultra-deep diaphragm wall is realized by using frequent measurement and correction technology,which is higher than the project control requirements 1/80o and ensures the smooth lowering and installation of steel box.The penetration type sediment thickness detector with more scientific basis is used to accurately detect the sediment thickness,which is used to control the sediment thickness and ensure the bearing capacity of the diaphragm wall.
关 键 词:张靖皋长江大桥 复合地下连续墙基础 现场工艺试验 超深异型地下连续墙 成槽施工关键技术
分 类 号:U443.24[建筑科学—桥梁与隧道工程] TU476.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.117.153.108