静压PHC管桩施工工艺及竖向承载力静载试验研究  被引量:1

Research on Construction Technology and Vertical Bearing Capacity Static Load Test of Static Pressure PHC Pipe Pile

在线阅读下载全文

作  者:连清辉 Lian Qinghui(Fujian Second Construction Group Co.Ltd.,Fuzhou,Fujian 350001)

机构地区:[1]福建省二建建设集团有限公司,福建福州350001

出  处:《江西建材》2023年第4期318-320,共3页Jiangxi Building Materials

摘  要:文中阐述静压PHC管桩施工工艺,结合现场静载试验,确定预应力高强混凝土管桩(PHC管桩)的竖向承载力与极限荷载作用下的沉降量,分析静压PHC管桩竖向承载力静载试验异常情况和处理措施,为该类型静压PHC管桩施工工艺及竖向承载力静载试验提供参考。By elaborating on the construction process of static pressure PHC pipe piles,combined with on-site static load tests,the vertical bearing capacity and settlement under ultimate load of prestressed high-strength concrete pipe piles(PHC pipe piles)are determined.The abnormal situation of static load tests on the vertical bearing capacity of static pressure PHC pipe piles is analyzed,and treatment measures are studied.This provides reference for the construction process and vertical bearing capacity static load tests of this type of static pressure PHC pipe piles.

关 键 词:PHC管桩 静载试验 竖向承载力 沉降量 

分 类 号:TU74[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象