检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:LI Yong ZHENG Jing WANG Feng-nian MA Xin-gen ZHANG Rui-xue SUN Ying-ying YIN Jian-bin TAO Zhi-gang
机构地区:[1]College of Geoscience and Surveying Engineering,China University of Mining and Technology-Beijing,Beijing 100083,China [2]State Key Laboratory of Coal Resources and Safe Mining,China University of Mining and Technology-Beijing,Beijing 100083,China [3]Shanxi Provincial Transportation Technology Research and Development Co.Ltd.,Key Laboratory of Highway Construction and Maintenance Technology in Loess Area,Transportation Industry,Taiyuan 030000,China [4]Huaneng Coal Technology Research Co.Ltd.,Beijing 10o83,China [5]State Key Laboratory for Geo Mechanics and Deep Underground Engineering,China University of Mining and Technology-Beijing,Beijing 10083,China [6]School of Mechanics and Civil Engineering,China University of Mining and Technology-Beijing,Beijing 100083,China
出 处:《Journal of Mountain Science》2023年第6期1759-1773,共15页山地科学学报(英文)
基 金:the National Natural Science Foundation of China(No.42272204);the Fundamental Research Funds for the Central Universities(Grant No.2021JCCXDC02);the Gansu Province Science and Technology Major Project(19ZD2GA005)for their support;financially supported by the State Key Laboratory for Geomechanics and Deep Underground Engineering(SKLGDUEK2020);Huaneng Group headquarters science and technology project(HNKJ21-H07);the Coal Burst Research Center of Jiangsu,China。
摘 要:Pillarless coal mining technology is a new practical technology.Based on the compensating mechanical behavior of the Negative Poisson’s Ratio(NPR)anchor cable on the roof,the roadway was successfully retained by the top cutting and pressure relief technology.This study utilizes the Digital Speckle Monitoring(DIC monitoring),stress-strain monitoring,and infrared thermal imaging systems to conduct physical model experiment of similar materials from the displacement,stress-strain,and temperature fields to investigate in depth the fracture change law of the overlying rock.In addition,it uses FLAC3D numerical simulation to invert the surface displacement settlement.The results show that the non-pillar overhead mining under the 110 mining method has little influence on the rock crack in the middle of the coal seam,and the crack development area is mainly concentrated in the overlying rock mass of the upward coal seam.The compensatory mechanical behavior of NPR anchor cable and the dilatation characteristics of rock mass have a good effect of retaining roadway along goaf,and can also reduce surface settlement.The 110 mining method provides a scientific basis for ecological environment protection and the development of other kilometer deep soft rock high ground stress underground projects.
关 键 词:No pillar mining Overhead mining NPR anchor cable Physical model of similar materials FLAC3D Numerical simulation Motion of overburden
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.17