检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:ZHAO Jin-peng TAN Zhong-sheng LI Lei WANG Xiu-ying
机构地区:[1]Key Laboratory of Urban Underground Engineering of Ministry of Education,Beijing Jiaotong University,Beijing 100044,China [2]School of Civil Engineering,Beijing Jiaotong University,Beijing 100044,China
出 处:《Journal of Mountain Science》2023年第6期1774-1789,共16页山地科学学报(英文)
基 金:the National Natural Science Foundation of China(Grant No.51978041)。
摘 要:Tunnels deeply buried have high crustal stress and are prone to large deformation disasters when encountering soft rock.The large deformation phenomenon during the construction process of the Maoxian Tunnel on the Chengdu-Lanzhou Railway is particularly evident.This article focuses on the large deformation problem of the No.1 inclined shaft of the Maoxian Tunnel,and uses on-site monitoring methods to explore the reasons for tunnel structure failure,and analyzes the mechanical behavior of the tunnel structure.By using numerical simulation methods,the effectiveness of the second-layer support in resisting creep loads in tunnels was studied,and the influence of the construction time of the secondlayer support on the mechanical properties of the tunnel was discussed.The results indicate that the first-layer support in the tunnel is a structural failure caused by asymmetric deformation caused by creep,while the second-layer support has a good effect on resisting creep loads.The research results can provide a technical reference for deformation control of squeezing tunnels.
关 键 词:Squeezing tunnel Mechanical responses Long-term creep Second-layer support On-site monitoring
分 类 号:U455.7[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.30