检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周圣 ZHOU Sheng(Water Affairs Bureau of Qixingguan District,Bijie City,Guizhou Province,Bijie,Guizhou 551700)
机构地区:[1]贵州省毕节市七星关区水务局,贵州毕节551700
出 处:《现代工程科技》2023年第2期117-120,共4页Modern Engineering Technology
摘 要:为解决病险水库除险加固中前期设计瑕疵、除险加固措施设计不当、配套资金不到位等问题,对病险水库除险加固现状进行了分析,提出落实水利工程项目管理基本要求、加强项目监管力度、落实资金使用情况等对策,以提高病险水库除险加固管控效果。In order to solve the problems of early design defects,improper design of reinforcement measures,and insufficient supporting funds in the reinforcement of dangerous reservoirs,this article analyzes the current situation of dangerous reservoir reinforcement.Also,this paper propose measures such as implementing the basic requirements of water conservancy project management,strengthening project supervision,and implementing the use of funds,in order to provide reference for improving the effectiveness of risk removal and reinforcement control of dangerous reservoirs.
分 类 号:TV697.3[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.147.165