复杂地质条件下泵站地基处理措施探讨  被引量:1

Discussion on foundation treatment measures of pump station under complex geological conditions

在线阅读下载全文

作  者:王红军 WANG Hongjun(Anhui Survey and Design Institute of Water Resources and Hydropower Co.,Ltd.,Hefei 230088,China)

机构地区:[1]安徽省水利水电勘测设计研究总院有限公司,安徽合肥230088

出  处:《江淮水利科技》2023年第3期21-24,共4页Jianghuai Water Resources Science and Technology

摘  要:地质条件对泵站地基处理设计影响较大,以沿江某泵站为例,针对泵站处复杂地质条件进行分析,结合工程特点,经过方案比较,采用塑性混凝土围封墙解决了渗透稳定和砂土液化问题,利用钉型水泥土双向搅拌桩+换填复合地基对地基进行加固处理,效果良好,可为类似项目设计提供参考。Geological conditions had a significant impact on the design of foundation treatment for pump stations.Taking a pump station along the Yangtze River as an example,this paper analyzed the complex geological conditions at the site of the pump station.After comparing different options and considering the engineering characteristics,a solution was proposed,which utilized a plastic concrete perimeter wall to address the issues of permeability stability and sand liquefaction.In addition,a combination of soil nailing cement and two-way mixing piles and replacement composite foundation was used to reinforce the foundation.The results were satisfactory,and this solution may serve as a reference for similar projects.

关 键 词:复杂地质 地基处理 围封墙 钉型水泥土双向搅拌桩 

分 类 号:TV233[水利工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象