BIM技术在大坝填筑施工现场碾压试验效果研究  被引量:4

Research on Rolling Test Effect of BIM Technology in Dam Filling Construction Site

在线阅读下载全文

作  者:崔晓斌 冷琰 CUI Xiao-bin;LENG Yan(China Power Construction Group Zhongnan Survey Design&Research Institute Co.Ltd.,Chang-sha 410014,China)

机构地区:[1]中国电建集团中南勘测设计研究院有限公司,长沙410014

出  处:《水利科技与经济》2023年第7期137-142,共6页Water Conservancy Science and Technology and Economy

摘  要:为了实时、准确、直观地掌握大坝质量情况,将建筑信息模型(BIM)技术运用于大坝砂砾料、碎石料和垫层料的现场碾压试验。结果显示,碾压次数和加水操作对3种石料均具有明显的质量提升效果。砂砾料铺料50cm、碾压15次不加水,碎石料铺料50cm、碾压10次不加水和铺料80cm、加水10%,垫层料碾压10次或在铺料40cm时加水10%为较为合理的碾压优化方案。研究获得有效的BIM模型和直观的质量评价可视化结果,有利于大坝的施工优化和质量智能监测。In order to accurately and intuitively grasp the quality situation of the dam in real time,the building information modeling(BIM)technology is applied to on-site rolling tests of dam gravel,crushed stone,and cushion materials.The results showed that the number of rolling operations and the addition of water had a significant quality improvement effect on all three types of stone materials.The reasonable rolling optimization plan is to pave gravel material with a thickness of 50cm and roll it 15 times without adding water,pave gravel material with a thickness of 50cm and roll it 10 times without adding water,pave material with a thickness of 80cm and add 10%water,compact cushion material 10 times or add 10%water when paving material with a thickness of 40cm.The research has yielded effective BIM models and intuitive visual results of quality evaluation,which are conducive to the optimization of dam construction and intelligent quality monitoring.

关 键 词:BIM技术 大坝填筑 碾压试验 质量评价 

分 类 号:TP391.9[自动化与计算机技术—计算机应用技术] TV52[自动化与计算机技术—计算机科学与技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象