检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王浩 何常胜 Wang Hao;He Changsheng(Yunnan Electric Power Test&Research Institute(Group)Co.,Ltd.,Kunming,650217,China)
机构地区:[1]云南电力试验研究院(集团)有限公司,云南昆明650217
出 处:《云南电力技术》2023年第3期65-67,86,共4页Yunnan Electric Power
摘 要:云南电网在实现异步联网运行后,各并网运行的大型水电机组一次调频动作频繁,机组在一次调频调节过程当中,其实际积分电量受各种因素的影响而不达标,水电厂也因此受到考核。本文结合云南某大型水电机组的一次调频过程,对一次调频期间机组的积分电量展开研究,从机组实际运行现状出发揭示其原因,并对两个细则辅助服务一次调频考核的完善提出建议。After Yunnan power grid has realized asynchronous operation,many hydropower units’primary frequency modulation move more frequently.In the process of primary frequency modulation,the actual integrated power of the units is not up to standard due to the influence of various factors,so the hydropower plants are also assessed.Based on the primary frequency regulation process of a large hydropower unit in Yunnan Province,this paper studies the integral power of the unit during the primary frequency modulation,reveals the reasons from the actual operation status of the unit,and it provides some suggestions on the improvement of the primary frequency modulation assessment of the two detailed rules auxiliary services.
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222