检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:曹子沛 Annisa binti Jamali 沐娟 任远林[1] Cao Zipei;Annisa binti Jamai;Mu Juan;Ren Yuanin(College of Applied Engineering,Anhui Business and Technology College,Hefei 231131,China;Faculty of Engineering,Universiti Malaysia Sarawak,Negeri Sarawak 999004,Malaysia)
机构地区:[1]安徽工商职业学院应用工程学院,合肥231131 [2]砂拉越大学工程学院,砂拉越州999004
出 处:《太阳能》2023年第7期40-53,共14页Solar Energy
基 金:安徽省高校自然科学研究项目“基于加权平均算法SOC控制均衡的光储联合一次调频技术研究”(KJ2021B001);安徽省职业与成人教育学会教育教学研究规划重点课题“智能制造专业群‘岗课赛证’双闭环育人模式的研究与实践”(Azcj2022008);安徽省质量工程项目“机电一体化技术专业岗课赛证综合育人改革”(2021gkszgg009)。
摘 要:2021年,中国多个省市发布政策要求光伏发电项目需配置一定比例的储能,储能配置比例为10%~20%,配置时长在1~4 h之间。储能的配置方式既可以是与光伏发电系统配套设置,也可以是由独立或共享租赁模式的储能电站进行储能。针对中国各地区采用电化学储能的独立储能及共享租赁储能电站调峰的政策进行分析,并对储能电站投资关键边界条件(比如:调峰补贴、调峰保障小时数、租赁价格、储能成本等)变化对项目内部收益率的影响进行定量测算和分析。分析结果显示:共享租赁储能电站在采用租赁叠加调峰补贴方式后已具备投资价值,而独立储能电站仅依靠调峰补贴暂不具备投资价值。In 2021,multiple provinces and cities in China issued policies requiring PV power generation projects to be equipped with a certain proportion of energy storage,with a configuration ratio of 10%to 20%and a configuration time of 1~4 h.The configuration method of energy storage can be set up in conjunction with the PV power generation system,or it can be stored by energy storage stations that use independent or shared leased modes.This paper analyzes the policies of independent energy storage and shared leased energy storage stations using electrochemical energy storage in various regions of China,and quantitatively calculates and analyzes the impact of changes in key boundary conditions for investment in energy storage stations(such as peak shaving subsidies,peak shaving guarantee hours,lease prices,energy storage costs,etc.)on the IRR of projects.The analysis results show that the shared leased energy storage power stations has investment value after adopting the leasing plus peak shaving subsidy method,while independent energy storage power stations relying solely on peak shaving subsidies do not currently have investment value.
关 键 词:电化学储能 共享租赁储能电站 独立储能电站 调峰 内部收益率 经济性
分 类 号:TM911.3[电气工程—电力电子与电力传动]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.240.165