检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李飞 刘方文 肖淑梅 曹军 王静曦 LI Fei;LIU Fang-wen;XIAO Shu-mei;CAO Jun;WANG Jing-xi(Zhejiang Huadong Engineering Consulting Co.,Ltd,Hangzhou 310014,China)
机构地区:[1]浙江华东工程咨询有限公司,浙江杭州310014
出 处:《云南水力发电》2023年第7期152-154,共3页Yunnan Water Power
摘 要:引水隧洞埋深较深,线路较长,须设置支洞辅助施工,部分洞段受地形限制,设置斜井辅助主洞施工;常规的运输车辆无法在洞内使用,为方便材料和石渣运输,建设一套安全可靠、满足施工需求的提升系统尤为重要;通过对斜井隧洞提升系统选型、施工组织、运行管理等方面,对绞车系统设计、安装、隧洞开挖的应用进行分析。The diversion tunnel is deeply buried and the route is long,so it is necessary to set up branch tunnels to assist in construction.Due to terrain limitations,some sections of the tunnel are equipped with inclined shafts to assist in the construction of the main tunnel.Conventional transportation vehicles cannot be used inside the tunnel.To facilitate the transportation of materials and stone slag,it is particularly important to build a safe and reliable lifting system that meets construction needs.This paper analyzes the application of winch system design,installation,and tunnel excavation through four aspects:selection of inclined shaft tunnel lifting system,construction organization,and operation management.
分 类 号:TV532[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38