梨园水电站调速系统PGV控制策略优化  被引量:1

Optimization of PGV Control Strategy for Governor System of Liyuan Hydropower Station

在线阅读下载全文

作  者:刘照友 余继乾 LIU Zhao-you;YU Ji-qian(Yunnan Huadian Jinsha River Midstream Hydropower Development Co.,Ltd.,Liyuan Power Generation Branch,Lijiang 674100,China)

机构地区:[1]云南华电金沙江中游水电开发有限公司梨园发电分公司,云南丽江674100

出  处:《云南水力发电》2023年第7期230-232,共3页Yunnan Water Power

摘  要:梨园电厂机组在低水头运行工况下,调速器导叶在最大开限运行时,监控系统下发的功增令存在持续累加情况,导致监控系统减负荷时出现调节速率慢、响应时间长的现象。针对以上情况进行了原因分析,改进了PGV(综合负荷给定)控制策略,并进行了试验验证,取得了良好的效果。Under the low head operating condition of generator set in Liyuan Power Plant,when governor guide vanes are operating at the maximum opening limit,there is a continuous accumulation of power increase orders issued by monitoring system,resulting in slow regulation rate and long response time when monitoring system is reducing load.This paper analyzes the reasons for above situation,improves PGV control strategy,and conducts experimental verification,achieving good results.

关 键 词:水轮机 调速器 一次调频 PGV 监控系统 试验 

分 类 号:TV734.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象