检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:谭华 TAN Hua(Huaneng Lancang River Hydropower Inc.,Overhaul Branch,Kunming 650051,China)
机构地区:[1]华能澜沧江水电股份有限公司检修分公司,云南昆明650051
出 处:《云南水力发电》2023年第7期233-236,共4页Yunnan Water Power
摘 要:从某水力发电厂500 kV升压站发生的一起因电压回路接线错误导致线路保护工频变化量阻抗元件越级跳闸的事件出发,介绍了现场检查处理方式、保护动作原理,分析故障原因,在此基础上,从专业运行管理角度研究了电压二次回路现场检测方法,并提出对后续电力设备的安全稳定运行以及继电保护二次回路检修维护方面的意见建议。The 500 kV booster station of a certain hydropower plant tripped due to a voltage circuit wiring error,which caused the impedance component of the line protection power frequency change to exceed the level.This paper introduces on-site inspection and handling methods,protection action principles,and analyzes the causes of faults.On this basis,on-site detection methods for voltage secondary circuits are studied from the perspective of professional operation management,and suggestions are proposed for the safe and stable operation of subsequent power equipment and maintenance of relay protection secondary circuits.
关 键 词:电压互感器 工频变化量 阻抗元件 线路保护 二次回路
分 类 号:TV734.3[水利工程—水利水电工程] TV737
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.144.251.232