大断面长距离矩形顶管顶进参数分析  被引量:10

Analysis on jacking parameters of large cross⁃sectional long⁃distance rectangular pipe jacking

在线阅读下载全文

作  者:王焱 杜守继[1] 王振智 李逸 李兴杰 WANG Yan;DU Shouji;WANG Zhenzhi;LI Yi;LI Xingjie(School of Naval Architecture,Ocean&Civil Engineering,Shanghai Jiaotong University,Shanghai 200240,China;MCC Baosteel Technical Service Co.,Ltd.,Shanghai 200941,China;Airport Project Department of China 20th Metallurgical Group Co.,Ltd.,Shenzhen 518101,China)

机构地区:[1]上海交通大学船舶海洋与建筑工程学院,上海200240 [2]中冶宝钢技术服务有限公司,上海200941 [3]中国二十冶集团有限公司空港项目部,广东深圳518101

出  处:《武汉大学学报(工学版)》2023年第7期826-834,共9页Engineering Journal of Wuhan University

摘  要:为探讨大断面长距离矩形顶管施工控制技术,依托重庆路下穿穗莞深城际高速矩形顶管工程,根据触变泥浆套的完整性调整摩擦系数,建立顶推力计算力学模型,分析计算顶推力。结合构筑物情况和实际施工数据,对顶进过程中的顶推力、顶进速度、刀盘扭矩和转速特征进行了分析。结果表明:顶推力在施工中逐渐增加,顶推力的稳定性对土体沉降影响较大;顶进速度越大则地表沉降越大,在顶进过程中顶进速度控制在6~10 mm/min为宜;顶进中构筑物的存在会降低刀盘扭矩的稳定性,而刀盘扭矩稳定性降低会导致构筑物沉降,刀盘扭矩对于完工通道也有较大的扰动。In order to discuss the construction control technology of large cross-sectional long⁃distance rectangular pipe jacking,the rectangular pipe jacking project of Guangzhou⁃Dongguan⁃Shenzhen intercity high⁃speed railway under Chongqing Road is selected as the research object.The friction coefficient is adjusted according to the integrity of thixotropic mud sleeve,the jacking force calculation mechanical model is established,and the jacking force is analyzed and calculated.Considering the structure situation and the construction data,the characteristics of jacking force,jacking speed,cutter head torque and speed in the process of jacking are analyzed.The results show that:1)the jacking force increases gradually during construction,but the stability of jacking force has a great impact on soil settlement;2)the greater the jacking speed is,the greater the ground settlement is,so it is appropriate to control the jacking speed at 6~10 mm/min in the process of jacking;3)the existence of structures in jacking will reduce the stability of cutter head torque,and the reduction of cutter head torque stability will also lead to the settlement of structures,and the cutter head torque also has a great disturbance to the completed channel.

关 键 词:矩形顶管 顶推力 顶进参数 沉降 

分 类 号:U45[建筑科学—桥梁与隧道工程]

 