检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘红波[1,2] 兰健 陈志华 孟亚丹[4] LIU Hongbo;LAN Jian;CHEN Zhihua;MENG Yadan(School of Civil Engineering,Tianjin University,Tianjin 300072,China;School of Civil Engineering,Heibei University of Engineering,Handan 056038,China;Key Laboratory of the Ministry of Education on Binhai Civil Engineering Structure and Security,Tianjin University,Tianjin 300072,China;Juli Sling Co.,Ltd,Baoding 072550,China)
机构地区:[1]天津大学建筑工程学院,天津300072 [2]河北工程大学土木工程学院,河北邯郸056038 [3]天津大学滨海土木工程结构与安全教育部重点实验室,天津300072 [4]巨力索具股份有限公司,河北保定072550
出 处:《建筑结构学报》2023年第7期246-254,共9页Journal of Building Structures
基 金:国家重点研发计划项目(2022YFB4200700)。
摘 要:拉索端部的锚固系统作为预应力结构关键节点,在设计过程中依赖于工程经验。为得到热铸锚承载力的计算方法,采用ABAQUS有限元分析软件建立高钒索端头热铸锚的有限元模型,并通过两个直径36 mm高钒索拔出试验进行验证后,研究钢丝锚固长度、钢丝插入铸料的倾角、钢丝数量、钢丝直径对于端头热铸锚黏结性能的影响,进而提出群丝效应系数以表征群丝黏结强度的下降,拟合得到热铸锚受拉承载力的计算公式。结果表明:使用Sping2单元模拟钢丝与合金铸体的黏结效应可行;单丝拔出有限元模型模拟结果与已有单丝试验的荷载-滑移曲线吻合;群丝效应系数与钢丝插入铸料角度正相关,与钢丝的数量、直径、锚固长度负相关;所提出的高钒索端头热铸锚的承载力预测公式计算误差不大于8%。The anchoring system at the end of cable,as a key node of the prestressed structure,depends on engineering experience in the design process.In order to get the calculation method of the bearing capacity of hot-casting socket,the authors presented the finite element models of high vanadium cables and hot casting socket in ABAQUS to study the effect of anchoring length of steel wire,angle of steel wire,number of steel wire and diameter of steel wire on bond property of hot-casting socket,and model was verified by two 36 mm high vanadium cable pull-out tests.The effect coefficient of wire group was put forward to explain the decrease of bonding strength of wire group.A prediction formula for tensile bearing capacity of hot-cast anchor was proposed.The results show that it is feasible to use Sping2 element to simulate the bonding mechanism between steel wire and alloy cast.The finite element model of single wire pull-out is in good comparison with the load-slippage curves of existing single wire tests.The effect coefficient of wire group is positively related to the angle of wire,and negatively related to the number,diameter and anchorage length of wires.The calculation error of the bearing capacity prediction formula of high vanadium cable end hot cast anchor is less than 8%.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63