500 kV地下变电站主变压器扩容工程新老设备衔接工作难点分析  

Analysis of Difficulties in Connecting the Old and New Equipments in the Main Transformer Expansion Project of 5o0 kV Underground Substation

在线阅读下载全文

作  者:秦佳鸣 李迅 QIN Jiaming;LI Xun(State Grid EHV Transmission&Transformation Company,SMEPC,Shanghai 200063,China)

机构地区:[1]国网上海市电力公司超高压分公司,上海200063

出  处:《电力与能源》2023年第3期264-267,共4页Power & Energy

摘  要:与常规变电站相比,500 kV全地下变电站主变压器扩容改造时所面临的问题更为复杂。某500 kV变电站在3号、6号主变压器扩建工程中遇到多项新老设备、系统衔接问题,重点对改造时对接工作中相关安全措施和运维方法进行了分析,保证了已投运设备安全运行的同时高质量地完成了新设备的接入。Compared with the conventional substation,the problems faced by the expansion and transformation of the main transformer in 500 kV underground substation were more complex.A lot of new and old equipment and system connection difficulties were encountered in the expansion project of No.3 and No.6 main transformer of a 500 kV substation.This research focused on the analysis of relevant safety measures and operation and maintenance methods in the connection work during the transformation,to ensure the safe operation of the equipment and thehigh-quality access of the new equipment.

关 键 词:变电站 变电站扩建 变电站综合自动化系统 母差保护 

分 类 号:TM63[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象