检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李亚南 Li Ya'nan(Lu'an Chemical Group Gaohe Energy Co.,Ltd.,Changzhi Shanxi 046000,China)
机构地区:[1]潞安化工集团高河能源有限公司,山西长治046000
出 处:《山西化工》2023年第7期142-144,共3页Shanxi Chemical Industry
摘 要:为保证W3305工作面正常回采,需及时对W3305工作面胶带顺槽、进风顺槽内的瓦斯进行抽采管,根据现场情况,设计了W3305-2胶带、进风顺槽各敷设一趟Φ355瓦斯管,用于该工作面煤层预抽;W3305高抽巷敷设两趟Φ710管路,用于高抽巷抽采;预抽管路与北翼回风西大巷Φ820瓦斯干管相连,由鲍村瓦斯泵站进行抽采的方案。确保了工作面的安全有序生产。In order to ensure the normal mining of W3305 working face,it is necessary to timely extract gas from the tape and air inlet grooves of W3305 working face.Based on the on-site situation,Φ355 gas pipe has been designed to be laid in W3305-2 tape and air inlet grooves for pre extraction of coal seams in this working face.LayΦ710 pipeline twice in W3305 high extraction roadway for high extraction roadway extraction.Pre-extraction pipeline is connected toΦ820 gas main pipe in north wing return air west main roadway and the gas pumping station in Baocun is used for pumping,which ensures safe and orderly production of the working face.
分 类 号:TD712.6[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.189.188.228