检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨亚东 Yang Yadong(Geological Survey Department of Jinneng Holding Coal Industry Group Majiliang Mine,Datong Shanxi 037001,China)
机构地区:[1]晋能控股煤业集团马脊梁矿地质测量部,山西大同037001
出 处:《山西冶金》2023年第6期131-133,共3页Shanxi Metallurgy
摘 要:为解决某煤矿条带煤柱膏体填充采掘过程中覆岩稳定性的问题,使用理论研究、数据模拟以及实地测量等方法,分析了膏体充填采掘过程中覆岩移动破坏规律。经实地测量表明:使用膏体充填采掘,巷帮移近量和顶底板移近量极值依次是42 mm、27 mm,距离开采面较远的巷道受采动影响比较弱,巷道矿压表现不明显,确保了回采巷道覆岩的可靠性及稳定性。In order to solve the problem of overlying rock stability during the filling and excavation process of strip coal pillars in a certain coal mine,theoretical research,data simulation,and on-site measurement methods were used to analyze the movement and failure law of overlying rock during the filling and excavation process of the paste.Field measurements have shown that the extreme values of the displacement of the roadway side and the displacement of the roof and floor are respectively 42 mm and 27 mm when using paste filling for excavation.The roadway far from the mining face is relatively weak in the impact of mining,and the rock pressure performance of the roadway is not obvious,ensuring the reliability and stability of the overlying rock in the mining roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.185