检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张礼 ZHANG Li(Safety Branch,China Coal Research Institute,Beijing 100013,China;State Key Laboratory of Coal Mining and Clean Utilization(China Coal Research Institute),Beijing 100013,China)
机构地区:[1]煤炭科学技术研究院有限公司安全分院,北京100013 [2]煤炭资源高效开采与洁净利用国家重点实验室(煤炭科学研究总院),北京100013
出 处:《煤炭技术》2023年第7期82-86,共5页Coal Technology
摘 要:为了有效解决工作面初采期因顶板大面积垮落而导致的瓦斯超限问题,采用现场实测和离散元数值模拟的方法,对申南凹煤矿20106工作面初采期的瓦斯涌出规律和顶板垮落特征进行了研究,提出了高位钻孔动态布孔工艺及其技术参数,并进行了现场应用考察。研究结果表明:20106工作面初采期瓦斯涌出量为14.4 m^(3)/min,需要抽采的最小瓦斯量为7.20 m^(3)/min;采空区顶板初次发生大面积冒落后,裂隙带发育最大高度为12 m,上邻近层1下煤层将垮落进入采空区,并释放大量瓦斯;随着工作面持续推进顶板垮落高度不断增大,覆岩破裂线以“乁”形向外扩展;当工作面推进长度等于工作面长度时,覆岩裂隙带发育高度达到最大,为48 m,约为13倍的采高;初采期180 m范围内共设计5个动态高位钻场,各钻场终孔目标高度依次增大,分别为11、16、22、31、38 m;采用抽采措施后上隅角及回风流的瓦斯浓度分别为0.42%、0.40%。In order to effectively solve the problem of gas overrun caused by large-area roof collapse in the initial mining period of the working face,using the methods of field measurement and discrete element numerical simulation,the gas emission law and roof collapse characteristics of 20106 working face in Shennanwa coal mine are studied,the dynamic hole layout technology and technical parameters of high-level drilling are put forward,and the field application is investigated.The results show that the gas emission in the initial mining period of 20106 working face is 14.4 m^(3)/min,and the minimum gas to be pumped is 7.20 m^(3)/min;the roof of the goaf falls behind in a large area for the first time,and the maximum height of the fracture zone is 12 m.The upper adjacent layer 1downand the lower coal seam will collapse into the goaf and release a large amount of gas;with the continuous advancement of the working face,the roof collapse height increases,and the overburden fracture line expands outward in the shape of " 乁 ";when the advancing length of the working face is equal to the length of the working face,the maximum development height of the overburden fracture zone is 48 m,which is about13 times the mining height;five dynamic high-level drilling sites are designed within 180 m in the initial mining period,and the final hole height of each drilling site increases in turn,which are 11,16,22,31 m and 38 m respectively;after adopting drainage measures,the gas concentrations in the upper corner and return air flow are 0.42% and 0.40% respectively.
分 类 号:TD712[矿业工程—矿井通风与安全] TD32
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.48.163