检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王俊[1] WANG Jun(Xinjiang Water Conservancy and Hydropower Survey and Design Institute Co.,Ltd.,Urumchi 830000,China)
机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,新疆乌鲁木齐830000
出 处:《中国水能及电气化》2023年第7期53-57,共5页China Water Power & Electrification
摘 要:阿克苏热电厂生产用水为阿克苏市污水处理厂处理后的再生水,生活用水为阿克苏市城市自来水。文章通过对中水水源的来水量、用水量、可利用水量、水质等进行分析,论证了电厂取用中水的可靠性及可行性,可为其他电厂使用中水提供参考和借鉴,具有一定的现实意义。The production water used in Aksu Thermal Power Plant is the reclaimed water treated by Aksu Municipal Sewage Treatment Plant,while the domestic water used is the urban tap water of Aksu City.This paper analyzes the inflow,outflow,available water and water quality of the reclaimed water source,and demonstrates the reliability and feasibility of using reclaimed water for power plant.The findings can provide reference for other power plants to use reclaimed water and have practical significance.
分 类 号:TM621[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15