海外核电项目施工总平面策划与实施——以卡拉奇K-2/K-3核电项目为例  

Planning and Application of General Construction Plan for Overseas Nuclear Power Projects

在线阅读下载全文

作  者:刘明辉 任阿琦 LIU Minghui;REN Aqi(China National Nuclear Corporation Overseas Ltd,Beijing 100000)

机构地区:[1]中国中原对外工程有限公司,北京100000

出  处:《现代工程科技》2023年第4期40-43,共4页Modern Engineering Technology

摘  要:以“华龙一号”海外首堆卡拉奇核电项目为例,介绍“华龙一号”双机组建设过程中的施工总平面策划,主要包括主厂区、生产临建、生活临建的规划,包括施工用水、施工用电、施工道路的总体规划,重点介绍了大件吊装的规划方案。通过海外核电项目的成功实践和经验反馈,为类似海外项目中的模块化施工和总体规划提供参考依据。This article takes the Karachi nuclear power project,the first overseas reactor of Hualong No.1,as an example to introduce the construction general layout planning during the construction process of Hualong No.1 dual unit,mainly including the planning of the main plant area,production temporary buildings,and living temporary buildings,including the overall planning of construction water,construction electricity,and construction roads.The focus is on the planning plan for large lifting.Through successful practices and experience feedback in overseas nuclear power projects,it can provide reference basis for modular construction and overall planning in similar overseas projects.

关 键 词:华龙一号 核电 施工总平面 大件吊装 

分 类 号:TL372.2[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象