检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李根 LI Gen
机构地区:[1]辽宁省水利事务服务中心,辽宁沈阳110003
出 处:《东北水利水电》2023年第8期44-46,72,共4页Water Resources & Hydropower of Northeast China
摘 要:在输水隧洞盾构施工过程中,将同步注浆层作为减震层可以加快施工进度,减少工程投入,具有重要的经济意义和技术价值。此次研究以具体工程为背景,利用数值模拟方式,探讨盾构施工输水隧洞同步注浆层刚度对隧洞抗震性的影响。结果显示,在盾构工程设计施工过程中,减小同步注浆减震层刚度可以有效提升输水隧洞抗震性。In the process of tunnel shield construction,using synchronous grouting layer as damping layer can speed up construction progress and reduce project investment,which has important economic significance and technical value.In this study,the influence of the stiffness of synchronous grouting layer on the seismic resistance of the tunnel under shield construction is discussed by numerical simulation.The results show that reducing the stiffness of the damping layer can effectively improve the seismic resistance of the tunnel during the design and construction of shield engineering.
分 类 号:TV431[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7