兰陵县会宝岭铁矿变质岩裂隙含水层放水试验技术探讨  被引量:1

DISCUSSION ON DEWATERING TEST TECHNOLOGY OF METAMORPHIC ROCK FISSURE AQUIFER IN HUIBAOLING IRON MINE,LANLING COUNTY

在线阅读下载全文

作  者:李军[1] 张纪堂 于杜涛 王少杰 LI Jun;ZHANG Ji-tang;YU Du-tao;WANG Shao-jie(Shandong Lunan Geological Engineering Survey Institute,Jining 272100;Linyi Huibaoling Iron Ore Co.,Ltd,Shandong Lanling 277700)

机构地区:[1]山东省鲁南地质工程勘察院,山东济宁272100 [2]临沂会宝岭铁矿有限公司,山东兰陵277700

出  处:《云南地质》2023年第2期230-236,共7页Yunnan Geology

摘  要:本文采用井下水文地质钻探及放水试验技术查明了会宝岭铁矿-410m~-760m标高井筒施工中出水点位置、岩性特征、水压、地下水导水通道及补给来源等水文地质成果;根据放水试验成果计算各涌水段水文地质参数,开展井筒施工涌水量预测,为井筒施工提出防治水建议,并为深部矿体开采提供重要的水文地质资料,也为沉积变质岩型铁矿床深部探水技术进行了讨论。In this paper,underground hydrogeological drilling and dewatering testing techniques were used to identify hydrogeological results,such as the location of water outlet points,lithological characteristics,water pressure,groundwater diversion channels and supply sources,during the construction of the shaft at an elevation of-410m to-760m at Huibaoling Iron Mine.The hydrogeological parameters of each water inflow section were calculated according to the dewatering test results,and the water inflow predition was carried out,so as to put forward water prevention suggestions for the shaft construction.The research results provide important hydrogeological data for the deep ore body mining,and a further discussion for the deep water exploration technology for the sedimentary metamorphic iron deposit.

关 键 词:放水试验 水囊式止水器 井筒检查孔 涌水量预测 会宝岭铁矿 山东兰陵 

分 类 号:P641.4[天文地球—地质矿产勘探]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象