检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:游正军 李彦锦 余群舟[2,3] 覃文波[2,3] YOU Zhengjun;LI Yanjin;YU Qunzhou;QIN Wenbo(Wuhan Metro Group Co.,Ltd.,Wuhan,Hubei 430070,China;National Technological Innovation Center for Digital Construction,Huazhong University of Science and Technology,Wuhan,Hubei 430074,China;School of Civil&Hydraulic Engineering,Huazhong University of Science and Technology,Wuhan,Hubei 430074,China)
机构地区:[1]武汉地铁集团有限公司,湖北武汉430070 [2]华中科技大学国家数字建造技术创新中心,湖北武汉430074 [3]华中科技大学土木与水利工程学院,湖北武汉430074
出 处:《施工技术(中英文)》2023年第13期65-71,共7页Construction Technology
基 金:国家自然科学基金重大项目:结构服役性能演化机理与寿命智能预测方法(52192664)。
摘 要:随着城市建设水平不断提高,地上和地下基础设施分布日渐密集。在此背景下,城市轨道交通建设过程中出现了越来越多的近接工程。这是随着城市建设而出现的难以避免的问题,也是近年来地铁建设面对的难题之一。结合某城市100余处地铁近接工程进行分析,归纳不同形式近接工程的特点,指出不同服役结构在近接工程中的关注重点,分析不同施工方法中各类风险的存在及成因,最终依照案例总结出不同施工方法对应的常用施工控制措施。结合已有案例,解决近接工程的难题需要从方案预先设计、设备合理选型、强化控制措施、落实施工监测等方面进行思考和完善。Nowadays,the level of urban construction continues to improve,and the distribution of aboveground and underground infrastructure is becoming increasingly dense.In this context,more and more proximity projects appear in the construction process of urban rail transit.This is an unavoidable problem with urban construction,and it is also one of the difficult problems faced by subway construction in recent years.This paper analyzes more than one hundred subway access projects in a certain city,summarizes the characteristics of different forms of access projects,points out the focus of attention of different service structures in access projects,analyzes the existence and causes of various risks in different construction methods,and finally according to the cases,the commonly used construction control measures corresponding to different construction methods are summarized.Based on the existing cases,in order to solve the problem of access engineering,it is necessary to think and improve from the aspects of predesign of the scheme,reasonable selection of equipment,strengthening of control measures,and implementation of construction monitoring.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166