作 者:赵田伟 ZHAO Tian-wei(Sinohydro Bureau 14 Co.,Ltd.,Kunming 650041,China)
机构地区:[1]中国水利水电第十四工程局有限公司,云南昆明650041
出 处:《水电站机电技术》2023年第7期28-30,163,共4页Mechanical & Electrical Technique of Hydropower Station
摘 要:以礼河四级电站复建工程引水隧洞布置了2条竖井压力钢管安装,竖井内开挖深度较深,压力钢管直管段长度均采用3 m/段进行设置。根据现场地质情况、资源配置、施工成本、项目投资等综合因素考虑,在竖井顶部预留了压力钢管安装所需的必要空间外,无多余的施工空间,在受限空间内施工成为了以礼河复建工程的控制难点。The diversion tunnel of Yili River Cascade IV Hydropower Station Reconstruction Project is equipped with two vertical shafts penstock.The excavation depth in the shaft is comparatively deep,and the length of penstock straight pipe section is 3 m per section.Considering the local geological conditions,resource allocation,construction cost,project investment and other comprehensive factors,there is no extra construction space except the necessary space for penstock installation which is reserved at the top of the shaft,.Construction in the confined space has become a difficult control of the Yili River Reconstruction Project.
分 类 号:TV547.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49