区域综合开发项目施工阶段土方的平衡与调配  被引量:1

Balance and Deployment of Earthwork in Construction Phaseof Regional Integrated Development Projects

在线阅读下载全文

作  者:杨振国 YANG Zhenguo(Shanghai Jianke Engineering Consulting Co.,Ltd.,Shanghai 200032,China)

机构地区:[1]上海建科工程咨询有限公司,上海200032

出  处:《建筑施工》2023年第7期1327-1330,共4页Building Construction

摘  要:以大型城市公园区域综合开发项目为研究对象,从土方工程量、土方土质、土方工序速率、土方工序施工计划4个维度分析了项目施工阶段土方平衡及调配方案,总结了土方平衡与调配时需要注意的内容,可为区域综合开发项目土方平衡及调配的实施提供参考。Taking the regional integrated development project of a large city park as the research object,the earth balance and deployment scheme in the construction stage of the project from four dimensions is analyzed,including earthwork volume,earth quality,earthwork process rate and earthwork process construction plan,and summarized the contents that need to be paid attention to in the earth balance and deployment,which can provide references for the implementation of earth balance and deployment in the regional integrated development project.

关 键 词:区域综合开发 土方平衡 土方调配 土方工序 

分 类 号:TU753[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象