检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:孙承 SUN Cheng(Shanghai Construction No.2(Group)Co.,Ltd.,Shanghai 200090,China)
出 处:《建筑施工》2023年第7期1395-1397,1403,共4页Building Construction
基 金:上海市2020年度“科技创新行动计划”启明星项目课题(20QB1403700)。
摘 要:以上海核心城区某城市更新项目为背景,对邻近地铁与历史建筑的地下清障影响控制进行了研究,介绍了全回转套管钻机施工工艺及在该项目中的应用,对拔桩引起的邻近隧道变形与建筑沉降进行了分析,总结了地下室清障分块的原则,提供了通过调整拔桩工艺参数、调整回填材料、优化场地布局等有效控制土体变形和建筑物沉降的具体措施,可供类似工程参考。With an urban renewal project in the core city of Shanghai as the background,the impact control of underground clearing adjacent to subway and historical buildings is studied,the construction process of full rotary casing drilling rig and its application in this project are introduced,the deformation of adjacent tunnel and building settlement caused by pile extraction are analyzed,the principles of basement clearing in blocks are summarized,and specific measures for effective control of soil deformation and building settlement by adjusting pile extracting process parameters,adjusting backfill materials and optimizing site layout are provided,which can be taken as references for similar projects.
分 类 号:TU746[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117