检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:吴清波 WU Qingbo(Zhengzhou Water Conservancy Engineering Supervision Center,Zhengzhou 450007,China)
机构地区:[1]郑州市水利工程监理中心,河南南郑州450007
出 处:《河南水利与南水北调》2023年第6期89-91,共3页Henan Water Resources & South-to-North Water Diversion
摘 要:陆浑灌区东一干渠郑州段是陆浑灌区的重要灌溉渠道,干渠历经30余年运行,其中三座渡槽存在混凝土碳化,钢筋锈蚀,槽身衔接部位开裂、漏水等现象。本次采用双组份喷涂聚脲弹性体做防渗处理,采用异丁基三乙氧基硅烷浸渍液做防碳化处理,采用双组份无收缩环氧树脂处理裂缝,采用聚氨酯结构密封胶处理接缝,处理后整体效果良好,修复经验可供类似工程借鉴。The Zhengzhou section of East First Trunk Canal in Luhun Irrigation District is an important irrigation channel in Luhun Irrigation District.After more than 30 years of operation,three aqueducts have carbonization of concrete,corrosion of steel bars,cracking and water leakage in the connecting parts of the channel body.Two-component spray polyurea elastomer is used for anti-seepage treatment,isobutyltriethoxysilane impregnation solution is used for anti-carbonization treatment,two-component non-shrink epoxy resin is used to treat cracks,and polyurethane structural sealant is used to treat joints.The overall effect is good after treatment.The repair experience can be used for reference in similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171