检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段玉三 Duan Yu-san
出 处:《建筑技术开发》2023年第8期135-137,共3页Building Technology Development
摘 要:对于地质条件复杂且地下水丰富的深基坑工程必须加强地下水处理。基于此背景,以合肥市宿松路(南二环–深圳路)快速化改造工程锦绣大道DN2600过路管工程为例,在较分析多种止水帷幕方案的基础上,提出长螺旋灌注桩与三重管高压旋喷桩组合止水帷幕方案,并对具体的施工过程及控制要点展开分析探讨。结果表明,组合止水帷幕能有效发挥长螺旋灌注桩和高压旋喷桩的技术优势,再加上科学组织及对施工过程的严格控制,能显著提高基坑工程止水效果。For deep foundation pit engineering with complex geological conditions and rich groundwater,it is necessary to strengthen groundwater treatment.Based on this background,taking the DN2600 crossing pipe project of Jinxiu Avenue in the rapid transformation project of Susong Road(South 2nd Ring Road-Shenzhen Road)in Hefei as an example,on the basis of comparing and analyzing various water stop curtain schemes,the paper puts forward a combined water stop curtain scheme of long spiral grouting pile and triple pipe high-pressure rotary jet grouting pile,and analyzes and discusses the specific construction process and control points.The results show that the combined water stop curtain can effectively give full play to the technical advantages of the long spiral grouting pile and the high pressure jet grouting pile,and with scientific organization and strict control of the construction process,it can significantly improve the water stop effect of the foundation pit project.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28