5G基站市外电建设与改造方案探讨  

Discussion on the Construction and Transformation Plan of 5G Base Station’s Offsite Electricity

在线阅读下载全文

作  者:王珏 WANG Jue(Hefei Branch of China Tower Co.,Ltd.,Hefei 230000,China)

机构地区:[1]中国铁塔股份有限公司合肥市分公司,安徽合肥230000

出  处:《通信电源技术》2023年第12期85-87,共3页Telecom Power Technology

摘  要:5G基站功耗较大,随着5G基站的大规模建设,对铁塔现网基站市电容量提出了新要求。大量基站存在市电容量不足等问题,无法有效满足5G基站供电需求,需要进行扩容改造。为更好更快地推进5G基站建设落地,对5G基站的外市电改造、设计、建设等解决方案加以深入研究与探讨,确保基站新增5G载荷后,外市电可以承载5G设备的长期稳定运行,合理降低建设成本,提升运维效率,在后续5G基站外市电建设及改造中具有一定的参考价值。The power consumption of 5G base stations is relatively high.With the large-scale construction of 5G,new requirements have been put forward for the city capacity of the existing iron tower network base stations.A large number of existing base stations have insufficient market capacity,which cannot effectively meet the power supply needs of 5G.Therefore,expansion and transformation are needed.In order to better and faster promote the construction and implementation of 5G base stations,this article conducts in-depth research and exploration on the design,construction,and other solutions for the transformation of 5G,it ensures that after adding 5G load to the base station,external power can carry the long-term stable operation of 5G equipment,reasonably reduce construction costs,improve operation and maintenance efficiency,and have certain reference value in the subsequent construction and transformation of 5G base station external power supply.

关 键 词:5G基站 外市电改造 解决方案 

分 类 号:TN929.5[电子电信—通信与信息系统]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象