检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马敏 MA Min(State Power Investment Group GCL Binhai Power Generation Co.,Ltd.,Yancheng 224500,China)
机构地区:[1]国家电投集团协鑫滨海发电有限公司,江苏盐城224500
出 处:《通信电源技术》2023年第13期52-54,共3页Telecom Power Technology
摘 要:针对近年来发电厂发生的多起380 V地保护越级动作造成380 V电机控制中心(Motor Control Center,MCC)母线失压事故,部分发电厂因同时受其他因素影响,导致发电机组发生非计划停运事故。因此,提出厂用电系统接地保护越级的动作解决方案,从而保障设备在投产运营期的安全稳定运行。Aiming at the power plants in recent years,many 380 V ground protection overstep action caused by 380 V Motor Control Center(MCC)bus loss of voltage accidents,some power plants at the same time by other factors lead to unplanned shutdown of generating units occurred accidents.Therefore,we propose a solution for the grounding protection overrun of the plant power system to ensure the safe and stable operation of the equipment during the commissioning and operation period.
分 类 号:TM621[电气工程—电力系统及自动化] TM77
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.119.248.54