检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:穆固天 李刚 李强 郑志强 张德千 张丰皓 MU Gutian;LI Gang;LI Qiang;ZHENG Zhiqiang;ZHANG Deqian;ZHANG Fenghao(Rizhao Steel Co.of Shandong Iron and Steel Group,Rizhao,Shandong 276800,China)
机构地区:[1]山东钢铁集团日照有限公司,山东日照276800
出 处:《冶金动力》2023年第4期57-60,88,共5页Metallurgical Power
摘 要:从铁矿烧结工艺参数控制角度研究了影响余热回收的因素,得出大烟道温度、终点温度波动趋势可间接表征烧结矿显热量的变化趋势。针对影响烧结大烟道温度、终点温度稳定性、终点位置控制等因素采取了相应的管控措施,结合当前公司烧结生产现状建立了烧结余热发电管控模型,2022年烧结余热发电量提高至20.51kWh/t,同比增加16.38%。The factors affecting waste heat recovery were studied from the perspective of iron ore sintering process parameter control,and it was concluded that the fluctuation trend of large flue temperature and end point temperature could indirectly characterize the trend of sintered ore apparent heat.Corresponding control measures have been taken for fac⁃tors affecting the sintering large flue temperature,end point temperature stability,end point position control,etc.A control model for sintering waste heat power generation has been es⁃tablished in conjunction with the current status of the company′s sintering production,the power generation capacity of the sintering waste heat has been increased to 20.51 kWh/t in 2022,representing a year-on-year increase of 16.38%.
分 类 号:TM617[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.135.206.125