检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王景芝 陈磊 蒋林君 李成浩 郑路 WANG Jingzhi;CHEN Lei;JIANG Linjun;LI Chenghao;ZHENG Lu(China Huaxi Engineering Design&Construction Co.,Ltd.,Chengdu 610031 China)
机构地区:[1]中国华西工程设计建设有限公司,成都610031
出 处:《路基工程》2023年第4期124-129,共6页Subgrade Engineering
摘 要:以四川西江河河道改道工程为研究对象,采用有限元软件对河堤挡墙不同施工工况稳定性进行对比分析。研究结果表明:挡墙背的填土材料对挡墙稳定性影响较大,当回填黏土高度到达8 m时,挡墙开始产生倾斜的趋势,同时在左侧墙脚位置开始出现塑性区;采用砾石土回填能够大大提高挡墙的稳定性,使挡墙处于稳定状态。Taking the river improvement project of Xijiang River channels in Sichuan as the research objec,the stability of embankment retaining wall under different construction conditions is compared and analyzed by finite element software.The results of thr research show that the backfill material at the back of the retaining wall has a great influence on the stability of the retaining wall.When the backfill clay reaches 8 m,the retaining wall begins to tilt,and plastic zone begins to appear at the left wall foot.Meanwhile,backfilling with gravel soil can greatly improve the stability of the retaining wall and keep the it in a stable state.
分 类 号:U417.11[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.133.137.102