检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Yizhou SUN Honglei SUN Chong TANG Yuanqiang CAI Feng PAN
机构地区:[1]College of Civil Engineering and Architecture,Zhejiang University,Hangzhou 310058,China [2]College of Civil Engineering,Zhejiang University of Technology,Hangzhou 310014,China [3]State Key Laboratory of Coastal and Offshore Engineering,Dalian University of Technology,Dalian 116024,China [4]Zhejiang Electric Power Design Institute Co.Ltd.,China Energy Engineering Group,Hangzhou 310012,China
出 处:《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》2023年第7期569-583,共15页浙江大学学报(英文版)A辑(应用物理与工程)
基 金:supported by the National Natural Science Foundation of China(No.U2006225);the European Union’s Horizon 2020 Marie Sklodowska-Curie Research and Innovation Staff Exchange Programme(No.778360)。
摘 要:Rock-embedded foundations with good uplift and bearing capacity are often used in mountains or hilly areas.However,there are soil layers with a certain thickness on the rocks in these mountainous areas,and the utilization of those soil layers is a problem worthy of attention in foundation construction.Considering construction-and cost-related factors,traditional single-form foundations built on such sites often cannot provide sufficient resistance against uplift.Therefore,an anchored pier foundation composed of anchors and belled piers,specifically constructed for such conditions,can be invaluable in practice.This paper introduces an experimental and analytical study to investigate the uplift capacity and the uplift mobilization coefficients(UMCs)of the anchored pier foundation.In this study,three in-situ monotonic pullout tests were carried out to analyze the load–displacement characteristics,axial force distribution,load transfer mechanism,and failure mechanism.A hyperbolic model is used to fit the load–displacement curves and to reveal the asynchrony of the ultimate limit states(ULSs)of the anchor group and the belled pier.Based on the results,the uplift capacity can be calculated by the UMCs and the anchor group and pier uplift capacities.Finally,combined with the estimation of the deformation modulus of the soil and rock,the verification calculation of the uplift capacity and UMC was carried out on the test results from different anchored pier foundations.
关 键 词:Uplift capacity Anchored pier foundation Belled pier Rock anchor Uplift mobilization coefficient(UMC)
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117