检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Yadong SONG Hu LI Jun CHENG Yuan YAO
机构地区:[1]State Key Laboratory of Traction Power,Southwest Jiaotong University,Chengdu 610031,China
出 处:《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》2023年第7期625-636,共12页浙江大学学报(英文版)A辑(应用物理与工程)
基 金:supported by the National Railway Group Science and Technology Program(Nos.N2020J026 and N2021J028);the Independent Research and Development Projects of Traction Power State Key Laboratory(No.2022TPL-T02),China。
摘 要:This paper puts forward a high-speed train bogie active stability method,based on frame lateral vibration control,for improving the stability and critical speed of railway vehicles at high speeds.Two inertial actuators apply active control forces to the front and rear end beams of the bogie frame.A scale model of bogie lateral dynamics is established,as well as the state space equation of the control system.Also,the multi-objective optimization is used to construct state feedback parameters,which take hunting stability and control effort into account.Furthermore,the effects of time-delay in the control system and suspension parameters on bogie hunting stability are studied.The dynamic behaviors and the stability mechanism of the bogie control system are analyzed.Finally,a 1:5 scale test rig is used to conduct a bogie active stability experiment.The results reveal that active control of frame lateral vibration can effectively improve the bogie system's hunting stability margin at high speeds,but time-delay in the control system cannot be ignored.
关 键 词:Railway vehicle BOGIE Active stability Scale test rig TIME-DELAY
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.224.33.135