检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄岗 邓德茂 彭洪进 王开波 王堃 金基伟 HUANG Gang;DENG Demao;PENG Hongjin;WANG Kaibo;WANG Kun;JIN Jiwei(Zunyi Power Supply Bureau of Guizhou Power Grid Co.,Ltd.,Guizhou Zunyi 563000,China)
机构地区:[1]贵州电网有限责任公司遵义供电局,贵州遵义563000
出 处:《农村电气化》2023年第7期16-18,共3页Rural Electrification
摘 要:220 kV某变电站1号主变电站压器保护装置中后备接地阻抗1时限保护动作跳开110 kV母联110开关,同时110 kV某线保护装置零序过流Ⅱ段、距离Ⅱ段保护动作,重合闸成功后距离Ⅱ段再次动作跳开该线路开关,造成110 kV某牵引变全站失压,降低了电网的供电可靠性。详细分析了110 kV线路发生发展性故障导致220 kV主变保护动作的原因并提出了整改建议。The backup grounding impedance protection of the 1#main transformer in a certain 110 kV station tripped the 110 kV buscouple breaker with the first time limit action.At the same time,the zero sequence overcurrent sectionⅡand distance sectionⅡprotection of a 110 kV line were activated.After successful reclosing,the distance sectionⅡtripped the line breaker again,causing a voltage loss in the entire station and reducing the power supply reliability of the power grid.This article provides a detailed analysis of the reasons for the protective action of the 110 kV main transformer caused by developmental faults on the 110 kV line and proposes rectification suggestions.
分 类 号:TM773[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15