作 者:邓海龙 张腾龙 黄涛 张燚 DENG Hailong;ZHANG Tenglong;HUANG Tao;ZHANG Yi(Southwest Electric Power Design Institute Co.,Ltd.of China Power Engineering Consulting Group,Chengdu 610056,China)
机构地区:[1]中国电力工程顾问集团西南电力设计院有限公司,四川成都610056
出 处:《电力勘测设计》2023年第S01期34-38,共5页Electric Power Survey & Design
摘 要:为提高企业EPC火电工程的质量管控能力,依据火电工程的质量管理经验和规范,提出EPC项目在前期准备阶段、过程实施阶段和收尾阶段的质量管控要点,从而提高合同履约水平和助力企业高质量发展。In order to improve the quality control ability of EPC thermal power projects,this paper puts forward the key points of quality control of EPC projects in the preliminary preparation,process implementation and closing stages based on the quality management experience and specifications of thermal power projects,so as to improve the level of contract performance and help the high-quality development of enterprises.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.217