检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:苏伟 Su Wei(Huozhou Coal Electricity Group Jinbei Coal Industry Co.,Ltd.,Shanxi Xinzhou 035100)
机构地区:[1]霍州煤电集团晋北煤业有限公司,山西忻州035100
出 处:《山东煤炭科技》2023年第7期26-28,共3页Shandong Coal Science and Technology
摘 要:晋北煤业5-103综采工作面需经过尾巷下料巷、皮带巷、轨道巷三条平行空巷,以尾巷下料巷为例,利用UDEC软件模拟研究过空巷期间工作面及空巷围岩塑性破坏规律,分析液压支架载荷变化规律,分析空巷加固的必要性,设计高水速凝材料空巷充填加固方案。结果表明:空巷局部充填参数和充填工艺合理,实现了综采工作面安全高效推过空巷,可在类似条件下推广使用。The 5-103 fully mechanized mining face of Jinbei Coal Industry needs to pass through three parallel empty roadways,namely the tail roadway feeding roadway,belt roadway,and track roadway.Taking the tail roadway feeding roadway as an example,UDEC software is used to simulate and study the plastic failure law of the working face and surrounding rock of the empty roadway during the period of passing through the empty roadway,analyze the load change law of the hydraulic support,analyze the necessity of empty roadway reinforcement,and design a high water rapid solidification material empty roadway filling and reinforcement scheme.The results show that the local filling parameters and filling process of the empty roadway are reasonable,achieving safe and efficient pushing of the fully mechanized mining face through the empty roadway,and can be promoted and used under similar conditions.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7