作 者:史文龙 Shi Wenlong(Jincheng Hongsheng Jincheng Mine Construction Engineering Co.,Ltd.,Shanxi Jincheng 048000)
机构地区:[1]晋城宏圣金成矿山建筑工程有限责任公司,山西晋城048000
出 处:《山东煤炭科技》2023年第7期84-86,共3页Shandong Coal Science and Technology
摘 要:针对长平矿底抽巷围岩变形破碎严重的问题,通过矿物成分分析得到了围岩中黏土类矿物成分含量,分析了底抽巷围岩稳定性,设计了底抽巷围岩超前预注浆和巷帮注浆加固方案,模拟分析了注浆效果。现场试验表明,注浆加固三个月后围岩变形趋于稳定,巷道变形量和顶板离层量均满足安全使用要求,有效控制了底抽巷围岩的变形失稳。Aiming at the serious deformation and fragmentation of the surrounding rock of the bottom drainage roadway in Changping Mine,the content of clay minerals in the surrounding rock is obtained through mineral composition analysis.The stability of the surrounding rock of the bottom drainage roadway is analyzed,and advanced pre grouting and side grouting reinforcement schemes are designed for the surrounding rock of the bottom drainage roadway.The grouting effect is simulated and analyzed.The field tests showed that after three months of grouting reinforcement,the deformation of the surrounding rock tends to stabilize,the deformation amount of the roadway and the separation amount of the roof all meet the requirements for safe use,effectively controlling the deformation and instability of the surrounding rock of the bottom drainage roadway.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147