检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯胜 Feng Sheng(Shanxi Tiandi Coal Machinery Equipment Co.,Ltd.,Shanxi Taiyuan 030006)
机构地区:[1]山西天地煤机装备有限公司,山西太原030006
出 处:《山东煤炭科技》2023年第7期96-98,共3页Shandong Coal Science and Technology
摘 要:为解决晋平煤业村庄下压煤开采难题,依据其采矿地质条件设计巷式充填开采工艺及施工方法,建立地表位移监测线研究地面移动规律。结果表明:支巷围岩变形微小,地表下沉量最大为27 mm,1501充填工作面开采对建筑物损害程度在Ⅰ级影响范围之内,最大限度地解放了村庄下压煤,并有效保护了地表建(构)筑物,取得良好的经济效益。To solve the problem of downward pressure coal mining in villages of Jinping Coal Industry,a roadway type filling and mining process and construction method are designed based on its mining geological conditions,and a surface displacement monitoring line is established to study the law of ground movement.The results show that the deformation of the branch roadway surrounding rock is small,and the maximum surface subsidence amount is 27 mm.The degree of damage to buildings caused by the 1501 filling working face mining is within the scope of Class I impact,which maximizes the liberation of downward pressure coal of the village and effectively protects surface buildings(structures),achieving good economic benefits.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7