检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张皎 Zhang Jiao(Beijing ZZHX Engineering Reseach Institute Co.,Ltd.,Beijing 102401,China)
机构地区:[1]北京中质华兴工程技术研究院有限公司,102401
出 处:《特种结构》2023年第4期98-102,共5页Special Structures
摘 要:为搞清楚水池顶板开大洞的加强措施以及合理的开洞方式,本文结合半地下污水处理厂工程实例,探讨地下水池顶板几种不同开洞方式,对上部结构以及结构整体抗震性能的影响。主要分析以下三种开洞方式,在洞口的两侧竖向构件之间拉梁,在拉梁的同时设置一定宽度的楼板,以及完全开敞不设梁板。通过定量分析几个考查指标,提出大洞口的合理处置方式,供类似的项目参考。To understand the appropriate methods for opening holes in the roof of a water tank,this paper discussed the effects of various hole-opening methods on the upper structure based on an example of semi-underground sewage treatment plant.Three hole-opening methods were analyzed:set up beams between the vertical members,set up beams and plates on the floor,and completely open the hole.Several inspection indicators were analyzed quantitatively,and a reasonable treatment method was proposed to the similar large hole.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49