基于ZYNQ的煤矿井壁应变测试系统设计  被引量:1

Design of Coal Mine Shaft Wall Strain Test System Based on ZYNQ

在线阅读下载全文

作  者:李涛 Li Tao(CCTEG Taiyuan Research Institute Co.,Ltd.,Taiyuan 030006,China;Shanxi Tiandi Coal Mining Machinery Co.,Ltd.,Taiyuan 030006,China;National Engineering Laboratory for Coal Mining Machinery,Taiyuan 030032,China)

机构地区:[1]中国煤炭科工集团太原研究院有限公司,太原030006 [2]山西天地煤机装备有限公司,太原030006 [3]煤矿采掘机械装备国家工程实验室,太原030032

出  处:《煤矿机械》2023年第8期18-21,共4页Coal Mine Machinery

摘  要:煤矿井壁变形过大存在较大的安全隐患,容易导致煤矿坍塌,影响煤矿开采的正常进行。传统的井壁变形监测方法依靠人工完成,无法实现全面监控。针对以上现状,设计了一种基于ZYNQ的煤矿井壁应变测试系统,系统设计有8个通道的数据采集节点,通过主控模块、微弱应变信号调理采集模块、电源健康管理模块、Flash存储模块、预警模块以及USB3.0通信模块建立了一整套井壁变形监测预警系统。实际应用表明,该系统稳定可靠,数据传输速度达到120 Mb/s以上,有助于井上数据监测中心人员对井壁进行提前加固处理,对于预防煤矿坍塌有较大意义。Excessive deformation of coal mine shaft wall poses significant safety hazards,which can easily lead to coal mine collapse and affect the normal operation of coal mining.The traditional deformation monitoring method of shaft wall relies on manual work,which can not achieve comprehensive monitoring.In view of the above situation,a coal mine shaft wall strain test system based on ZYNQ was designed.The system has eight channels of data acquisition nodes.A complete set of shaft wall deformation monitoring early warning system was established through the main control module,weak strain signal conditioning and acquisition module,power health management module,Flash storage module,early warning module and USB3.0 communication module.The practical application shows that the system is stable and reliable,with a data transmission speed of over 120 Mb/s,which is helpful for the personnel of the underground data monitoring center to reinforce the shaft wall in advance and has great significance in preventing coal mine collapse.

关 键 词:煤矿井壁 应变测试 ZYNQ USB3.0 

分 类 号:TD265.32[矿业工程—矿井建设] TP274[自动化与计算机技术—检测技术与自动化装置]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象