牛栏江-滇池补水工程干河泵站金属结构设备布置  

Metal Structure Equipment Layout of Dry River Pump Station of Niulanjiang-Dianchi Water Replenishment Project

在线阅读下载全文

作  者:张宇 ZHANG Yu(Yunnan Water Resources and Hydropower Survey and Design Institute,Kunming 650000)

机构地区:[1]云南省水利水电勘测设计院,昆明650000

出  处:《现代制造技术与装备》2023年第5期165-167,共3页Modern Manufacturing Technology and Equipment

摘  要:云南省牛栏江-滇池补水工程由德泽水库枢纽工程、干河提水泵站系统工程及输水线路工程组成。干河泵站金属结构设备布置的主要目的是保障下游泵站的安全运行。文章主要介绍了干河泵站金属结构设备的总体布置,并针对各闸门的结构设计进行说明。The Niulanjiang-Dianchi water replenishment project in Yunnan Province consists of Deze Reservoir hub project,dry river pump station system project and water transmission line project.The main purpose of metal structure equipment layout in dry river pump station is to provide more reliable guarantee for the safe operation of downstream pump station.This paper mainly introduces the general arrangement of the metal structure equipment of the dry river pump station,and explains the structural design of each gate.

关 键 词:牛栏江-滇池补水工程 干河泵站 金属结构设备 

分 类 号:TV675[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象