优化采购合同条款减少造价纠纷的技术措施  被引量:1

Technical Measures to Optimize the Terms of Procurement Contracts to Reduce Cost Disputes

在线阅读下载全文

作  者:徐茂盛 XU Mao-sheng(Gongcheng Management Consulting Co.,Ltd,Dongguan,Guangdong 523079)

机构地区:[1]公诚管理咨询有限公司,广东东莞523079

出  处:《供应链管理》2023年第8期88-96,共9页SUPPLY CHAIN MANAGEMENT

摘  要:随着经济的发展,工程建设项目在固定资产投资中的比重加大,合同主体方的维权意识不断增强,出现了大量工程建设项目合同纠纷。文章通过分析造价纠纷的现状,包括纠纷的内容,纠纷的处理渠道,工程合同纠纷案件处理的难点,定位建设工程合同条款中纠纷的内容和关键点,提出针对纠纷可以采取的优化措施和建议,及针对纠纷结合案例可以采取的优化措施,供大家参考。With economic development,there has been an increase in the proportion of engineering construction projects within fixed asset investment.Furthermore,there has been a growing awareness of the contractual rights protection by the contracting parties,leading to a substantial rise in contract disputes within engineering construction projects.This paper analyzes the current situation of cost disputes,including the content of disputes,the channels for handling disputes,the difficulties in handling project contract disputes,locating the content and key points of disputes in the terms of the construction project contract,and puts forward optimization measures and suggestions that can be taken for disputes.The study further provides optimization measures and recommendations to address the disputes and offers insights on integrating disputes and cases for reference.

关 键 词:合同管理 造价纠纷 工程合同 造价法律 

分 类 号:F224[经济管理—国民经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象