出  处:《水电与新能源》2023年第8期6-8,共3页Hydropower and New Energy

摘  要:基于大岗山拱坝地质条件复杂、地震烈度高,按照静载设计、动载复核的原则,对大岗山拱坝抗震设计开展了研究。通过计算分析和模型试验,采用布置梁向抗震钢筋、跨缝阻尼器、抗力锚索与坝基薄弱岩体灌浆等工程技术措施,提升了大岗山水电站超高拱坝的抗震稳定安全性。Dagangshan arch dam is of complex geological conditions and high seismic intensity.According to the principles of design with static loads and check with dynamic loads,the anti-seismic design of the dam is studied.Based on calculation analysis and model tests,engineering technical measures such as the arrangement of cantilever anti-seismic reinforcement,cross-joint dampers,resistance anchor cables,and grouting of weak rock masses in dam foundation are adopted to improve the seismic stability and safety of the dam.

关 键 词:大岗山水电站 强震区 超高拱坝 抗震 设计优化 

分 类 号:TV642.4[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象